* Fences & Gates: If there are any gates that they will have to go through, be sure they are a minimum of 1 ft. wider than the building.
Fences must be removed; they cannot move a building over a fence.
We will also need more room if we will need to go through the gate at an angle.
Please also make sure the roof eave of your house or other building is not in the path of the shed delivery.
* Overhead Wires: If there are any low overhead wires, such as power lines, telephone lines, cable TV, etc., please inform the delivery company when they call ahead so that they can work around them.
Overhead Power lines are generally high enough they will not interfere with the delivery of the shed.
* Leveling and Blocking: While it is usually not required if your site is level, we highly recommend you place your shed on concrete blocks or gravel to keep the skid runners off of the ground. Although the skid runners are pressure treated, setting up your shed on concrete blocks will greatly extend the life of your shed by keeping it out of the moisture and dirt. * Gravel Pad: Although it is usually not required, a gravel pad is a good option as it will provide a porous surface for water to drain away from the shed.
If you are installing a gravel pad, we recommend using crushed limestone gravel.
Please make sure the pad area is large enough as well as being level.
If you need any more information, please call (502) 321-5246.